What Does a Whole-House Cabinetry Project Usually Include, and How Should the Quotation Scope Be Split?

Whole-house cabinetry may include entrance storage, TV units, dining cabinets, kitchens, wardrobes, vanities, laundry cabinets, wall panels and concealed doors. The quotation should be separated by room, product, configuration and delivery boundary rather than presented as one total.

Article Scope Breakdown Online View
What Does a Whole-House Cabinetry Project Usually Include, and How Should the Quotation Scope Be Split?
Resource Notes

What This Resource Helps You Solve

“Whole-house cabinetry” can sound like one simple product, but the actual project may cover more than a dozen rooms, many cabinet types and a long list of materials, hardware, lighting and closure details. When the quotation shows only one total, it becomes difficult to see what is included, what is provisional and what must be purchased separately.

The objective is not to divide the project into as many lines as possible. It is to make every item traceable to a room, a drawing and a delivery responsibility.

1. Products commonly included in whole-house cabinetry

AreaTypical products
EntranceShoe cabinets, bench seating, coat storage, console units, display cabinets and wall panels
Living roomTV units, display cabinets, bookcases, fireplace units, storage, wall panels and concealed doors
Dining roomSideboards, wine cabinets, coffee stations, glass display cabinets and serving counters
Kitchen and pantryKitchen cabinets, islands, tall units, pantry storage, beverage stations and equipment cabinets
Bedrooms and dressing roomsWardrobes, walk-in closets, bedside units, dressing tables, bed structures and TV cabinets
BathroomsVanities, mirror cabinets, tall storage, niche cabinets and basin-area storage
StudyBookcases, desks, filing cabinets, display cabinets and wall storage
Laundry and utility areasLaundry cabinets, sink units, cleaning storage, wall units and household storage

Wall panels, door casings, concealed doors and fixed furniture should be assigned at the beginning of the project because they often share closures and installation sequencing with the cabinetry.

2. Split by room first, then by product

A clear whole-house BOQ normally uses the room or area as the first level and a product ID as the second. For example:

Example IDProductQuotation description
K01Kitchen base, wall and tall unitsCarcases, fronts, hardware, worktops, closures and appliance housings
KI01Kitchen islandStorage, seating, worktop, support, services and visible finishes
W01Primary bedroom wardrobeInternal layout, drawers, hanging, lighting, glass doors and handles
V01Primary bathroom vanityCabinet, basin, worktop, mirror storage, hardware and moisture requirements
WP01Living-room wall panelsArea, substrate, finish, joints, concealed doors and edge closures

This structure allows drawings, BOQ, packing labels and installation locations to use the same references, and it makes room-by-room scope changes easier to manage.

3. Break down the construction of each product

  • Carcase: board type, thickness, construction, backs, shelves and moisture requirements;
  • Fronts and finishes: material, colour, profile, edging, paint or veneer scope;
  • Hardware: hinges, runners, handles, pull-outs, lifts and corner systems;
  • Worktops and basins: material, thickness, cut-outs, edge details, upstands and transport method;
  • Lighting and electrical items: LED strips, profiles, sensors, drivers, wiring and maintenance access;
  • Special items: glass, metal, upholstery, fluting, curves, concealed doors and unusual closures.

Two products both called a wardrobe or wall panel may have very different internal configurations and fabrication requirements.

4. Identify included, provisional and excluded items

StatusHow to describe itPurpose
IncludedState the brand, material, quantity, workmanship and service scopeProvides the basis for comparison and approval
ProvisionalState the allowance, quantity or unit rate and the condition still to be confirmedPrevents an allowance from being read as a final commitment
ExcludedList appliances, sanitaryware, site substrate, installation, transport, tax or other boundariesReduces contract and site-stage disputes

5. Do not compare the total only by linear metre or square metre

Linear-metre and square-metre rates are useful for early budgeting, but whole-house cabinetry contains different depths, heights, internal fittings and finishes. Confirmed quotations are more reliable when calculated by actual product ID, quantity and configuration.

Wall panels may be measured by area, lighting and hardware by item, and standalone cabinetry by unit or product ID. The important point is that the pricing unit corresponds with the drawings and quantity schedule.

6. Delivery responsibilities are part of the quotation scope

Beyond the products, identify who is responsible for detailing, samples, packing, container loading, sea or local freight, unloading, access, installation and site adjustments. Trade terms and site conditions can materially change the complete project cost.

7. What to check when comparing two whole-house quotations

  • Both quotations use the same drawing revision and BOQ;
  • The number of rooms and products is the same;
  • Carcase, front, hardware and worktop specifications match;
  • Wall panels, lighting, glass, metal and special fabrication are not omitted;
  • Packing, transport, installation and tax boundaries are comparable.
Clarify the scope before comparing the total. A quotation that can be traced to rooms and product IDs is suitable for detailing, production and delivery.

The larger the whole-house project, the more valuable a structured product-scope schedule becomes. It helps the client control the budget and gives designers, factories and installers one common project language.

Who Should Read This

Clients and project teams sourcing whole-house cabinetry for villas, apartments, serviced residences or show homes who need clear room, product and delivery boundaries.

What to Prepare

Room schedule, plans and elevations, cabinet IDs, quantities, material and hardware direction, wall-panel scope, worktop and lighting requirements, transport and installation boundaries.

How BESTWOO supports it

BESTWOO structures the BOQ by room and product ID, separates cabinets, fronts, hardware, worktops, wall panels, lighting and special items, and identifies included, provisional and excluded scope.